Plants in operation and under construction

We show five GRegioflex plants on farms (one of them under construction), wood gasification modules, a wastewater plant at a cheese dairy and HTC projects with wastewater treatment plants. Status as of November 2026.

Aerial view of the Rheinmühle in Chur with silo tower, fields and mountains in the background

Four plants in pictures

From our projects. The full list of all plants follows below.

  • GRegioflex containers in the timber barn, seen from the side

    GRegioflex

    Aeugstertal ZH

    50 kWe, two containers in a new timber barn. In operation since July 2025.

    Go to GRegioflex
  • Green plant container with an open door, surrounded by pastures with cows

    GRegioflex

    Ermensee LU

    20 kWe, the heat supplies the newly built farmhouse. In operation since September 2024.

    Go to GRegioflex
  • New loose-housing barn with timber roof, feed alley and cubicles on a farm

    GRegioflex

    Samstagern ZH

    50 kWe, under construction, commissioning 2027. The picture shows the farm’s new loose-housing barn.

    Go to GRegioflex
  • Overall view of the wastewater biogas plant in Schönengrund: green container with gas pipe next to a timber building

    Industrial wastewater

    Appenzeller Milchspezialitäten, Schönengrund AR

    Wastewater treatment with biogas recovery at a cheese dairy. In operation since 2022.

    Go to industrial wastewater

GRegioflex on farms

  • Aeugstertal ZH

    GRegioflex · 50 kWe · in operation since July 2025. Beef fattening with around 300 cattle and around 60 ha of agricultural land. Two digesters (40 ft), two gas storage units of 70 m³ each, connection to the existing heat network, energy management and automatic flushing system in the barn. Project name: ‘Leonardo’.

  • Illighausen TG

    GRegioflex · 20 kWe · in operation since July 2025. Young stock rearing with around 25 livestock units and agritourism.

  • Ermensee LU

    GRegioflex · 20 kWe · in operation since September 2024. Dairy and arable farm with 50 dairy cows. The heat supplies the farmhouse newly built in 2024.

  • Suhr AG

    GRegioflex · 2 × 20 kWe · in operation since January 2026. Arable farming with cattle and poultry fattening, plus agricultural contracting.

  • Samstagern ZH

    GRegioflex · 50 kWe · under construction, commissioning 2027. Calf fattening with around 100 livestock units, a large photovoltaic array and battery storage.

Wood gasification

  • Lindauer AG, Steinen SZ

    Wood gasification · 1 module, 50 kWe · in operation since 2025. A joinery that generates power and heat from its own residual wood during the six winter months. Also installed: a façade photovoltaic system and a 125 kWh storage unit.

  • VZ Kanalreinigung AG, Wangen SZ

    Wood gasification · 2 modules, 100 kWe combined, including drying.

  • Rheinmühle, Chur

    Wood gasification · 3 modules, 50 kWe each · currently being converted.

Industrial wastewater

  • Appenzeller Milchspezialitäten, Schönengrund AR

    Industrial wastewater · wastewater treatment with biogas recovery at a cheese dairy · heat for the company’s own production process · in operation since 2022.

HTC

  • Abwasserverband Buchs Sevelen Grabs SG

    HTC · pilot trials in February 2025, market analysis, assessment of a large-scale plant (‘Carbon Cascade’ project). The association treats 10 million litres of wastewater every day. Status: under assessment.

  • Pilot and demonstration project ‘HTC Innovationscampus Rheinmühle’

    HTC · Swiss Federal Office of Energy (SFOE), 2018 to 2020 · final report public.

  • HTC test plant

    HTC · pilot scale · 180 to 200 l/h, 180 to 200 °C, 20 bar · trials with sewage sludge from various Swiss wastewater treatment plants.