Projects
Plants in operation and under construction
We show five GRegioflex plants on farms (one of them under construction), wood gasification modules, a wastewater plant at a cheese dairy and HTC projects with wastewater treatment plants. Status as of November 2026.

Four plants in pictures
From our projects. The full list of all plants follows below.

GRegioflex
Aeugstertal ZH
50 kWe, two containers in a new timber barn. In operation since July 2025.
Go to GRegioflex
GRegioflex
Ermensee LU
20 kWe, the heat supplies the newly built farmhouse. In operation since September 2024.
Go to GRegioflex
GRegioflex
Samstagern ZH
50 kWe, under construction, commissioning 2027. The picture shows the farm’s new loose-housing barn.
Go to GRegioflex
Industrial wastewater
Appenzeller Milchspezialitäten, Schönengrund AR
Wastewater treatment with biogas recovery at a cheese dairy. In operation since 2022.
Go to industrial wastewater
GRegioflex on farms
Aeugstertal ZH
GRegioflex · 50 kWe · in operation since July 2025. Beef fattening with around 300 cattle and around 60 ha of agricultural land. Two digesters (40 ft), two gas storage units of 70 m³ each, connection to the existing heat network, energy management and automatic flushing system in the barn. Project name: ‘Leonardo’.
Illighausen TG
GRegioflex · 20 kWe · in operation since July 2025. Young stock rearing with around 25 livestock units and agritourism.
Ermensee LU
GRegioflex · 20 kWe · in operation since September 2024. Dairy and arable farm with 50 dairy cows. The heat supplies the farmhouse newly built in 2024.
Suhr AG
GRegioflex · 2 × 20 kWe · in operation since January 2026. Arable farming with cattle and poultry fattening, plus agricultural contracting.
Samstagern ZH
GRegioflex · 50 kWe · under construction, commissioning 2027. Calf fattening with around 100 livestock units, a large photovoltaic array and battery storage.
Wood gasification
Lindauer AG, Steinen SZ
Wood gasification · 1 module, 50 kWe · in operation since 2025. A joinery that generates power and heat from its own residual wood during the six winter months. Also installed: a façade photovoltaic system and a 125 kWh storage unit.
VZ Kanalreinigung AG, Wangen SZ
Wood gasification · 2 modules, 100 kWe combined, including drying.
Rheinmühle, Chur
Wood gasification · 3 modules, 50 kWe each · currently being converted.
Industrial wastewater
Appenzeller Milchspezialitäten, Schönengrund AR
Industrial wastewater · wastewater treatment with biogas recovery at a cheese dairy · heat for the company’s own production process · in operation since 2022.
HTC
Abwasserverband Buchs Sevelen Grabs SG
HTC · pilot trials in February 2025, market analysis, assessment of a large-scale plant (‘Carbon Cascade’ project). The association treats 10 million litres of wastewater every day. Status: under assessment.
Pilot and demonstration project ‘HTC Innovationscampus Rheinmühle’
HTC · Swiss Federal Office of Energy (SFOE), 2018 to 2020 · final report public.
HTC test plant
HTC · pilot scale · 180 to 200 l/h, 180 to 200 °C, 20 bar · trials with sewage sludge from various Swiss wastewater treatment plants.